At ms concept, we always act in a customer- and solution-oriented manner to work out the best possible option for our partners.
The project, which was completed in January 2021, comprised approx. 1200m DN700 spiral-welded steel pipes in various lengths and two different wall thicknesses. In close coordination with the customer, desired changes and adjustments to the range were made before production.
In the specific case, an interim storage solution should be provided for a ground foundation project. For this purpose, in cooperation with the customer, we had the subsoil compacted on a disused company site and set it up as a project warehouse.
After a brief preliminary discussion with the customer and logistician, a suitable approach was quickly agreed and then implemented according to plan.
Thanks to well-timed processes, delivery and unloading were implemented within a calendar week, thus ensuring material availability for the client.