Steel pipes for refurbishment of gas pipeline at the A14

ms con-cept GmbH supplies PE coated steel pipes for the refurbishment of a 2.7 km section of a gas pipeline at the A14 near Ludwigslust (Mecklenburg-Vorpommern)

The tubes with dimensions of 323.9 x 6.3 mm-12 m in material L290ME were manufactured after order placement in November 2017 at our partner plant in Italy, stored according to customer requirements and delivered on time in June 2018 to the construction site.

The transfer of the total of 150 tons of steel pipes takes place between June and November 2018, wherein individual connecting pieces of the entire line are laid trenchless in a horizontal built underground channel.